Quilt Diary: Finishalong 2019 Quarter 2 Goals

Quarterly Goals

Once again it is time to put together the list of possible finishes in the upcoming 2nd quarter of 2019. I will be linking up with #FAL2019.  My host is Capitola Quilter.

I have a lot of UFOs from last quarter to bring forward. Let’s get started!

  1.  Hexagon Charity Quilt.  This darn project is still hanging around.  I set it for my April one monthly goal.  I NEED to get this off my list.  The guilt is killing me! I also added this one to my @sunflowerquilting #ssqfinishalong2019round2 goals.

    img_2477
    Dot to Dot quilting on the Hexagon Charity Quilt
  2. 2010 New Year Eve’s Quilt.  Another one that has been hanging around.  I did actually work on it last quarter so the guilt isn’t so high.  Just have to finish the free motion and binding. I also added this one to my @sunflowerquilting #ssqfinishalong2019round2 goals.

    3eea70cf-80a9-4857-b266-affd3eefcb60
    Stitching in the ditch on the 2010 NYE Quilt
  3. 2018 Quilters Planner Sew-a-long Classic Beauty BOM.  Still need to assemble, baste, quilt and bind.

    img_3052
    2018 Quilter’s Planner BOM Sew-A-Long – June
  4. Shabby Fabric’s Sunflower A-Door-naments wall hanging.  I still only have to quilt this one and it is done.  I think I will skip the metallic thread and save the thread for another day and project.

    img_0134
    Shabby Fabric’s August A-Door-N-Aments – Sunflowers
  5. Shabby Fabric’s Apple A-Door-naments wall hanging.  I just need to baste, turn, and quilt.

    img_0755
    Shabby Fabric’s September A-Door-N-Aments – Apples
  6. Sunflower Star potholders.
  7. Blue Pinwheel potholders.  I finished one out of the 3 last quarter.  Just need to layer, baste, quilt, and bind.

    img_0082
    Knot potholders, Sunflower Ohio Star potholders, & Blue pinwheels potholders
  8. Autumn wall hanging.  A little work done last quarter.  I finished fusing all the shapes on the pieced background.  Need to applique, baste, quilt, bind.img_1469
  9. Apple Blooming Vase wall hanging.  I have absolutely fallen in love with this series.  The itch is strong to drop everything and work on this one.  The apple one only had the background pieced.  I need to fuse, applique, layer, baste, quilt, and bind this one.

    img_0757
    Shabby Fabric’s Blooming Series – September – Apples
  10. Pansies Blooming Series has arrived and I have just got to do this one.  So I am adding it to the list for this quarter.

    img_1467.jpg
    Shabby Fabrics Blooming Series – May Pansies
  11. Alison Glass Trinket Quilt.  Started the Sew-A-Long in March and we are supposed to have the entire quilt completed by May 20th. I am adding it to the list.  I also added this one to my @sunflowerquilting #ssqfinishalong2019round2 goals.

    img_1397.jpg
    Some of my blue trinket blocks from Lines & Shapes weeks
  12. Shabby Fabric’s Mug Rug – Strawberries.  I just need to finish whip stitching the shapes down, do the hand embroidery, layer, finish.

    img_1294
    Shabby Fabric June Wooly Mug Rug – Strawberries
  13. Shabby Fabric’s Mug Rug – Sunflowers.  Need to start this one.  Once I do, I will be halfway through the series.

    img_1470.jpg
    Shabby Fabric’s Wooly Mug Rug – August Sunflower
  14. Easy Pieced Table Runner for May by Shabby Fabric’s.  I watched the You Tube video a couple of days ago and decided I NEED to make this table runner for my kitchen island.  I haven’t decided if I am going with all the purples, but I have downloaded and printed the pattern.

    img_1468-633263431-1555181877348.jpg
    Free download on new series Easy Pieced Table Runner for May

Quarter Two: Work in Process

  1.  Peacock Colorstory Miss Rosie Blocks.  My goal is to finish 8 more blocks this quarter.  I did get them done last quarter 😉

    img_0991.jpg
    Peacock Colorstory used with Miss Rosie’s Receipe Cards
  2. 365 Block Challenge blocks.  I am current for 2019! I still struggle with mitered blocks but am getting better every time.  My goal is to be current on June 30th still!

    img_1437.jpg
    April 7th Corner Stone for Center Medallion
  3. Halifax Temperature Quilt.  I did finish through August 2018 last quarter as planned.  I need to cut some more triangles because I find making these little blocks as feeder of other blocks the easiest way I get these done.  My goal is to finish September, October, November, and December 2018 this quarter.
    img_0312
    Halifax Batik Temperature HST Quilt 2017-2019

     

  4. Quilter’s Planner 2019 Block of the Month Sew-A-Long.  I am on target!  I meet last month’s goals.  This quarter is to continue being current so that would mean finishing the April, May, and June blocks each month.

    img_1403
    The Quilter’s Planner 2019 Block of the Month Sew-Along: Jan-Feb-Mar
  5. Farmer’s Wife 1920 English Paper Piecing Sew-A-Long with Gnome Angel in Australia.  I finished 8 blocks last quarter instead of my 9.  Close.  I am setting a goal for 9 blocks this quarter.  I am working on Block 20 – Churn Dash this week.  I have been pleased with my progress.

    img_1435
    Block 20 – Churn Dash cut & basted – ready to go
  6. Tula Pink Charm Squared blocks.  I started these quilt blocks on a whim but still need to finish them before I lose all the pieces.

    img_1471
    Tula Pink Charms squared blocks

As always, I have hundreds of other projects I could finish, work on, etc.  I will stick with these 20 projects.  Good Luck everyone.  The idea is to set a goal and work towards it.  If you make progress, it is a win!

Peggy

 

Quilt Diary: February One Monthly Goal finish – City Scape Wall Quilt

City Scape Mini Wall Quilt Finish!

With one week left I have already finished the linkup with Elm Street One Monthly Goal for February.  This has to be a first.  I’m usually waiting until the last minute to finish up.  It feels good to have this old PIQF class project done.  It was a fun project. Continue reading “Quilt Diary: February One Monthly Goal finish – City Scape Wall Quilt”

Quilt Diary: Knot & Dresden Potholder finish!

Knot Potholders

Already finished my knot orphan blocks into potholders.  I decided not to put loops so they can double as hot pads for the table if needed.  Once I got focused, it was not so bad and I played around with some ideas for when I quilt the finished quilt top this orphan blocks belonged too. Continue reading “Quilt Diary: Knot & Dresden Potholder finish!”

Quilt Diary: Bunny Wooly Mug Rugs finish!

I have my first February finish!  I finished up my bunny wooly mug rugs.  We are all set for Easter.  I am linking this up with the first Quarter of the 2019 Finishalong. My original list of goals can be found HERE.

Continue reading “Quilt Diary: Bunny Wooly Mug Rugs finish!”

Quilt Diary: February Goals

I have been pondering since Friday what I would like to get done this month.  I have quite a few things on my quarter one list and definitely need to work on them.  So I pulled out the list to see what would be my focus of something that has been out there for a long time.

Continue reading “Quilt Diary: February Goals”

Quilt Diary: Watermelon Mug Rugs! done in Utah

Just an update on my projects I worked on this past weekend while in Salt Lake for my grandson Shaun’s hockey tournament.  Most of the weekend was spent watching hockey but we did manage to go to Utah’s Natural History Museum.  I so forgot how 11 year olds zoom through at light speed.  Where I would have dwaddle for several hours, we were done in two hours.

Continue reading “Quilt Diary: Watermelon Mug Rugs! done in Utah”

Quilt Diary: Finishalong 2019 Quarter One Goals

It is time to set goals for the next three months with #FAL2019.  My host is Capitola Quilter.

I have about 30 Works in Process and it was hard to narrow it down.  Last year I would list 9 and then end up working on something not on my list.  So typical me! Or start something new.  I thought it wasn’t working so I didn’t participate 3rd or 4th quarter.  Guess what?  I finished even less.  New strategy for 2019.  List an even dozen of projects that catch my eye to finish.  Of course I will be working on random things that aren’t targeted to be finished until later quarters but I figured what could it hurt?  I got out my Quilter’s Planner.  Made my list.

Quarter 1 Finishalong Goals:  Finished projects Continue reading “Quilt Diary: Finishalong 2019 Quarter One Goals”