Quilt Diary: Finishalong 2019 Quarter 2 Goals

Quarterly Goals

Once again it is time to put together the list of possible finishes in the upcoming 2nd quarter of 2019. I will be linking up with #FAL2019.  My host is Capitola Quilter.

I have a lot of UFOs from last quarter to bring forward. Let’s get started!

  1.  Hexagon Charity Quilt.  This darn project is still hanging around.  I set it for my April one monthly goal.  I NEED to get this off my list.  The guilt is killing me! I also added this one to my @sunflowerquilting #ssqfinishalong2019round2 goals.

img_2477
Dot to Dot quilting on the Hexagon Charity Quilt
  • 2010 New Year Eve’s Quilt.  Another one that has been hanging around.  I did actually work on it last quarter so the guilt isn’t so high.  Just have to finish the free motion and binding. I also added this one to my @sunflowerquilting #ssqfinishalong2019round2 goals.

  • 3eea70cf-80a9-4857-b266-affd3eefcb60
    Stitching in the ditch on the 2010 NYE Quilt
  • 2018 Quilters Planner Sew-a-long Classic Beauty BOM.  Still need to assemble, baste, quilt and bind.

  • img_3052
    2018 Quilter’s Planner BOM Sew-A-Long – June
  • Shabby Fabric’s Sunflower A-Door-naments wall hanging.  I still only have to quilt this one and it is done.  I think I will skip the metallic thread and save the thread for another day and project.

  • img_0134
    Shabby Fabric’s August A-Door-N-Aments – Sunflowers
  • Shabby Fabric’s Apple A-Door-naments wall hanging.  I just need to baste, turn, and quilt.

  • img_0755
    Shabby Fabric’s September A-Door-N-Aments – Apples
  • Sunflower Star potholders.
  • Blue Pinwheel potholders.  I finished one out of the 3 last quarter.  Just need to layer, baste, quilt, and bind.

  • img_0082
    Knot potholders, Sunflower Ohio Star potholders, & Blue pinwheels potholders
  • Autumn wall hanging.  A little work done last quarter.  I finished fusing all the shapes on the pieced background.  Need to applique, baste, quilt, bind.
    img_1469
  • Apple Blooming Vase wall hanging.  I have absolutely fallen in love with this series.  The itch is strong to drop everything and work on this one.  The apple one only had the background pieced.  I need to fuse, applique, layer, baste, quilt, and bind this one.

  • img_0757
    Shabby Fabric’s Blooming Series – September – Apples
  • Pansies Blooming Series has arrived and I have just got to do this one.  So I am adding it to the list for this quarter.

  • img_1467.jpg
    Shabby Fabrics Blooming Series – May Pansies
  • Alison Glass Trinket Quilt.  Started the Sew-A-Long in March and we are supposed to have the entire quilt completed by May 20th. I am adding it to the list.  I also added this one to my @sunflowerquilting #ssqfinishalong2019round2 goals.

  • img_1397.jpg
    Some of my blue trinket blocks from Lines & Shapes weeks
  • Shabby Fabric’s Mug Rug – Strawberries.  I just need to finish whip stitching the shapes down, do the hand embroidery, layer, finish.

  • img_1294
    Shabby Fabric June Wooly Mug Rug – Strawberries
  • Shabby Fabric’s Mug Rug – Sunflowers.  Need to start this one.  Once I do, I will be halfway through the series.

  • img_1470.jpg
    Shabby Fabric’s Wooly Mug Rug – August Sunflower
  • Easy Pieced Table Runner for May by Shabby Fabric’s.  I watched the You Tube video a couple of days ago and decided I NEED to make this table runner for my kitchen island.  I haven’t decided if I am going with all the purples, but I have downloaded and printed the pattern.

  • img_1468-633263431-1555181877348.jpg
    Free download on new series Easy Pieced Table Runner for May

    Quarter Two: Work in Process

    1.  Peacock Colorstory Miss Rosie Blocks.  My goal is to finish 8 more blocks this quarter.  I did get them done last quarter 😉

    img_0991.jpg
    Peacock Colorstory used with Miss Rosie’s Receipe Cards
  • 365 Block Challenge blocks.  I am current for 2019! I still struggle with mitered blocks but am getting better every time.  My goal is to be current on June 30th still!

  • img_1437.jpg
    April 7th Corner Stone for Center Medallion
  • Halifax Temperature Quilt.  I did finish through August 2018 last quarter as planned.  I need to cut some more triangles because I find making these little blocks as feeder of other blocks the easiest way I get these done.  My goal is to finish September, October, November, and December 2018 this quarter.

  • img_0312
    Halifax Batik Temperature HST Quilt 2017-2019
  • Quilter’s Planner 2019 Block of the Month Sew-A-Long.  I am on target!  I meet last month’s goals.  This quarter is to continue being current so that would mean finishing the April, May, and June blocks each month.

  • img_1403
    The Quilter’s Planner 2019 Block of the Month Sew-Along: Jan-Feb-Mar
  • Farmer’s Wife 1920 English Paper Piecing Sew-A-Long with Gnome Angel in Australia.  I finished 8 blocks last quarter instead of my 9.  Close.  I am setting a goal for 9 blocks this quarter.  I am working on Block 20 – Churn Dash this week.  I have been pleased with my progress.

  • img_1435
    Block 20 – Churn Dash cut & basted – ready to go
  • Tula Pink Charm Squared blocks.  I started these quilt blocks on a whim but still need to finish them before I lose all the pieces.

  • img_1471
    Tula Pink Charms squared blocks

    As always, I have hundreds of other projects I could finish, work on, etc.  I will stick with these 20 projects.  Good Luck everyone.  The idea is to set a goal and work towards it.  If you make progress, it is a win!

    Peggy

    4 thoughts on “Quilt Diary: Finishalong 2019 Quarter 2 Goals”

    1. That is one impressive list – so many beautiful projects and gorgeous colour! Thank you for joining us – from the 2019 FAL Hosts!

    2. Hi Peggy! Yowza that is a real list. I had to giggle at your first two items – one project is STILL hanging around and the other is from 2010?! I love that you made it your April OMG project. That will certainly help you focus on it and get it off the list for good! I look forward to seeing how you do, and I’m back here cheering you on. ~smile~ Roseanne

    Comments are closed.