September is here and it is time to linkup with Elm Street Quilts for the One Monthly Goal. I have been thinking about this for the last few days wondering what I should commit to. Thinking about what is close to being done and I just need a little push. I narrowed down to four possibilities: Schoolhouse mug rugs, Blooming Pansies, Autumn wall hanging, or pulling out my Halloween/October placemats. The verdict is: Halloween/October placemats! It is time to pull them out of the closet and finish them up. So I am committing to making four October placemats with my purple, black, and orange kitty fabric. See above for sample.
Applique Update
Schoolhouse Wooly Mug Rugs
I worked on them this weekend while at the hockey tournament and was able to finish all the whip stitching for all colors except red and burgundy. I am very close to being done with this phase. Of course, this is the easy part for me. I struggle with the embroidery embellishments. This project doesn’t have as much as some of the others. I haven’t looked to see if it is a new stitch or not. Making the apples will be fun.
A Year in Words – Autumn
This one is almost done. I have some backstitching to do on the leaves and apples, the hanging sleeve, and binding. Soooo very close. It will be nice. I have a cute Leaves hanger for it. Can’t wait to be done.
Blooming Series – Pansies
I have not worked on this at all. Nothing new to show. Just have purple machine applique left.
Sew-A-Long Updates
Mama Gypsy Quilt QAL
I missed my weekly goal with Amy on this one. I had hoped to have row 2 & 3 done by Sunday night, but it was finished on Monday night. So I reset this week’s goal to finishing row 3 & 4. Last night found me sewing together and ironing row 1 & 2. Then laying out and prepping row 4. It is all set to be sewn this week. This will finish up the center of the quilt. After this I will have to add the black borders, then piece the next border. Hmmmm. Stay focused on Row 4 for now.
#100days100blocks2019
I am still current on this one. There were a few close moments this year as my attention was elsewhere and I did not realize I had run out of premade blocks. We are set until Friday now. I even have done the fabric pull for the next 6 blocks. When I am ready, I have enough blocks to put together rows 6 & 7. Here is September 1st – 4th (blocks 63-66).
#fw1920eppsal
I keep plugging away at block 27 Darting Birds. Since each unit looks the same, there is not much point in posting another pic. I am wrapping up 3rd out of 4 units. Close to be done!
Cosmos Mystery Quilt with Cotton Cuts
Clue number 2 arrived yesterday. I read all the instructions and organized all of the precut pieces. Even sewed step one. Exciting stuff!
Other projects on the sewing table
I have been staring at quite a few other projects. I haven’t actively worked on anything else right now. I did pull out the Tula Pink Charm Squared blocks and I keep staring at my NYE quilt. I keep staring at my accuquilt as I need to cut some more triangles for my Halifax Temperature quilt as well as update my notebook with temperatures through August 2019. None of the other couple hundred WIPs have I touched.
That’s it for today!
Happy Quilting and Safe Journeys!
Peggy Stockwell
Happy early Halloween! Thanks for linking up with Elm Street Quilts One Monthly Goal and good luck with your project.
I love your placemat layout — you’ve got lots of great looking projects in the works! Good luck with your September goals!
Thanks Karla