To Do Tuesday #101

Hello Everyone! Hope all of you who are on the West Coast are surviving this Heat Wave. It has been following me around everywhere I go. I am currently in Vancouver, Washington and it is suppose to top out at 100F today. It will start cooling off here. Unfortunately, I will be heading home tomorrow to San Jose, where the heatwave is in its second wave. Beating the heat has been a challenge.

I will be linking up with Carol at Quilt Schmilt for To Do Tuesday. Come check it out.

To Do Tuesday https://quiltschmilt.ca/

Under the Needle The Past Two Weeks

I was on the road last Tuesday so I did not post anything which is fine. I have not done any quilting since I went on the road anyway. Let me share what I did before I left.

Since I don’t have a lot to share this week, I thought I would share photos that I forgot to take last time of my Blooming Pointsettas. Next step for the Pointsettas Wallhanging is to quilt & bind.

  • I finished gluing the binding to two more design boards. It felt good to be done.
  • Over several days, I worked on (after finding them) pulling fabrics and glue basting the next two Farmers Wife blocks #47 & #48. One is yellow and orange and the other is all shades of yellow.
  • Finished cutting all the black background pieces for my FPP quilt blocks. (Not pictured)
  • Started cutting the colored fabric for my FPP quilt blocks. I finished strawberry, melon, gold, and emerald from Alison Glass 2024 Sunprint collection (not pictured)
  • I also took some time to look at the instructions for the Alison Glass SAL – Stamp Quilt. I believe my fabric came after I left (or at least I hope so). The SAL began July 1st. (Not pictured)
  • My most important accomplishment was having my long arm serviced before leaving on the trip!!!!
  • I also started going through my stack of 2 1/2 inch squares and pulling them for my last block I need to make for Scrappiness is Happiness – Block Sixty-Four (not pictured)

June’s Goals Accomplished

It was actually a pretty good month. I finished the following:

  1. Ruby’s Garden EPP block 23
  2. May 2024 SJ Temperature Cottage
  3. 2024 June Monthly Color Challenge block
  4. One Churn Dash block
  5. Blocks 88-92 from #100days100blocks2023
  6. Section 3 of Scrappiness is Happiness SAL
  7. Borders on Patriotic Table Runner
  8. Finished block 46 of #fw1920eppsal
  9. 2 more design boards
  10. Finished the Sunshine Quilt top
  11. Had my long arm serviced

July’s Goal List: *Week of July 9th

We start with a whole new list for this month. I have a total of 32 projects I want to work on. Obviously, I am not tackling everything this week but I want to get my list started. I need to create a new section now that my long arm is back up and running. Let’s start with the following:

  1. *Quilt Sunshine quilt
  2. *Finish June Cottage for 2024 Temperature Quilt
  3. July Monthly Color Challenge block – pull fabrics
  4. 2018 365 block challenge – Cut Sep 1 & 2 blocks
  5. 2023 100 days 100 blocks – cut blocks 93 & 94
  6. 2022 Scrappiness is Happiness – make block Sixty Four
  7. Sweet Childhood Memories – Assemble one side border
  8. Continue working on Leaders & Enders project: Daydreamer
  9. Make 1 Churn dash block
  10. Tula Pink Butterfly quilt – make HST for section 1
  11. Finish cutting blocks for 2024 Venti AG Sunprint FPP quilt
  12. Cut block 1 for 2024 AG Stamp quilt
  13. Pull fabrics for Queen of Diamonds EPP block 3-1
  14. Ruby’s Garden EPP – start block 24
  15. *1920 Farmers Wife EPP – start block 47
  16. Sash one block of Lost & Found EPP quilt
  17. 2019 100 days 100 quilts (FEB UFO) – assemble backing
  18. 2019 Zuma quilt (MAR UFO) – Make one side pieced border
  19. 2017 Halifax Temp Quilt (APR UFO) – Finish Sep 2018
  20. 2022 Bring Home the Tree (JUN UFO) – Pull fabric for one car block
  21. *2018 100 days 100 blocks (JUL UFO) – Assemble Row 1
  22. 2023 Gnome is where the Heart Is – Start January
  23. *Finish Blooming Pointsettas
  24. Finish appliquing A Year in Words Christmas
  25. Start Sep Backdoor Banner
  26. Start appliquing On Wander Lane Bunny Knoll
  27. 2024 Reno Teeny Tiny Elephant Collage – finalize elephant
  28. Finish Rainbow placemats
  29. Assembled all the items needed to finish Patriotic Project Bag
  30. *Finish Patriotic Table Runner
  31. Patriotic Napkins – pull fabrics
  32. Patriotic Placemats – pull fabrics & pattern

Whew! I put an * next to my highest priorites for the week to see if that helps me focus 🧘 LOL! 😂

Afterthoughts

Cali snuggling before I left for my trip

I am feeling anxious to get home and start working on my projects. I feel like I have been gone forever. I know my daughter has appreciated my help. Unfortunately carrying things up and down the stairs is not something I do well.

Everyone stay cool and hopefully I will have more things to share next week.

Peggy Stockwell in Vancouver, Washington when it is 100F 🔥

One thought on “To Do Tuesday #101”

Comments are closed.